Help centre
العربية Back to sayvara.com

Projected use

Where this meter would end the period if sending goes on at the pace so far.

Updated

Formula

use so far × length of the period ÷ time passed, rounded up

In symbols: projected = ⌈used × period ÷ elapsed⌉

Worked example

With example figures (not your data), the ⓘ card works it out like this:

2,600 − 2,000 = 600

The projection is rounded up to a whole unit; the line shows the units over the allowance.

What it is based on

For the example figures:

  • Use so far: 1,640; allowance: 2,000.
  • The projection starts once a full day of the period has passed.
  • The overage so far, plus the further units over the allowance that would be billed, at this period’s average price per unit on this channel: about SAR 90.00 in all, before VAT. When the prepaid wallet paid some of the units over the allowance so far, only the same share of the further units is billed.
  • An estimate, not an invoice.

In Sayvara, select the ⓘ next to the figure to see this explanation worked with your own live figures.

More figures in this group · See every figure we calculate