Improvement projects
Group tickets or a theme into one piece of work with an owner and dates, link and unlink tickets, and see the score before and after.
An improvement project turns a problem into one piece of work. It has a name, an owner, dates and an optional target score. You link the tickets it fixes, and Sayvara measures the score before and after the start.
Open it from the side menu: Journeys, then the Improvement projects section at the top of the page. The Journey maps section takes you back to your maps.
Create a project
- Select New project.
- Fill in the form:
| Field | What to enter |
|---|---|
| Name | A short name for the work. Required. |
| Description | What the project changes. |
| Owner | The member responsible. Required. |
| Status | Planned, Running, Finished or Cancelled. |
| Start date | Required. The before-and-after comparison starts on this day. |
| End date | Leave it empty while the end is open. |
| Goal metric and Target score | NPS from -100 to 100, satisfaction as percent satisfied from 0 to 100, or effort from 1 to 7 where lower is better. |
| Units | The branches or regions the project covers. Pick none to cover the whole organisation. Do not pick a unit inside another picked unit. |
| Themes | The comment themes the project works on, separated by commas, up to 20. |
- Select Create project. You see Project created.
To change a project, open it and select Edit, then Save.
Find a project
The list shows each project with its status, owner, dates, number of tickets and themes, and goal. Use Status to show only projects in one status. Select Open project to see its page.
Link tickets
- Open the project and go to Linked tickets.
- Select Link tickets.
- In Find tickets, search by customer, reason, survey, comment or ticket ID. The search covers the 200 most recent tickets you can see from the last 366 days.
- Tick the tickets to add, then select Link selected. You see Tickets linked.
A project holds up to 200 tickets. The dialog shows how many it can still take. If a ticket cannot be linked, you see Not linked: with its ID and the reason, for example a ticket outside the project's units.
The Linked tickets card shows how many tickets are open, in progress, waiting, resolved or closed, and how many are overdue. Each ticket links to its page.
Unlink a ticket
- Select Unlink next to the ticket.
- Select Unlink ticket to confirm. You see Ticket unlinked.
The ticket itself does not change, and you can link it again.
Read the measured impact
The Measured impact card compares the goal metric Before and After the start date, over the same number of days on each side, and shows the Change with a result:
| Result | Meaning |
|---|---|
| Improved | The score went up, and the change is unlikely to be chance. |
| Worse | The score went down, and the change is unlikely to be chance. |
| No clear change | The difference could be chance. |
| Not enough answers | One side has too few answers to compare. |
When the project has a target, the card shows Goal reached or Goal not reached. When it covers several units, By unit shows each one. The card also says what it measured: the project's units, the units of its tickets, or the whole organisation. Open How this is measured for the method in plain words.
Before the start date, the card shows the score before the start, and the comparison begins on that day.
Who can do what
| You want to | You need |
|---|---|
| See improvement projects | A role that can see dashboards |
| Create or edit a project, and link or unlink tickets | The survey designer permission |
A project may only cover units you can see. A project for the whole organisation needs access to every branch.
Common messages
| Message | What to do |
|---|---|
| Someone saved this project since you opened it. Close the form and open it again. | Close the form, open it again and redo your change. |
| A unit lies inside another picked unit. Keep only the higher one. | Remove the lower unit. |
| A ticket is not in the project's units. | Add the ticket's unit to the project, or leave the ticket out. |
| This project holds 200 tickets, the most it can take. | Unlink tickets you no longer need first. |
Was this page helpful?
Thanks. Need more help? Email support@sayvara.com